TECS supported Taziker on the Manea wheel timber bridge renewals. TECS provided Survey, P-way Design, Engineering, and Delivery support.

TECS supported Taziker on the Manea wheel timber bridge renewals. TECS provided Survey, P-way Design, Engineering, and Delivery support.




Scope of works:


1. Site Survey and Validation


  • 3D CAD Survey

  • Structure Gauging

  • Site Photographs and Survey sheets


2. P-Way


Design Report including:

  • Commentary

  • Form A/B Track (Certificates)

  • Design Risk Assessment

  • IDC Certificate

  • Schedule of Works (Specification Page)


Track Design

  • Track Alignment

  • Gauging Assessment


General Arrangement Drawing including:

  • Horizontal track alignment and Vertical profile

  • Track cross sections

  • Base plate arrangements and packing schedules

  • Wheel Timber sizes including any tapering

  • Stressing diagram


The Manea delivery was planned across seven core weekend possessions, where installations were prioritised by existing timber conditions. This meant the planning and delivery were challenging based on the significant volume of works. All works went ahead without issue.