Case Study 2: Manea Wheel Timber Bridges Renewals, Year 3
TECS supported Taziker on the Manea wheel timber bridge renewals. TECS provided Survey, P-way Design, Engineering, and Delivery support.
TECS supported Taziker on the Manea wheel timber bridge renewals. TECS provided Survey, P-way Design, Engineering, and Delivery support.
Scope of works:
1. Site Survey and Validation
3D CAD Survey
Site Photographs and Survey sheets
2. P-Way
Design Report including:
Commentary
Form A/B Track (Certificates)
Design Risk Assessment
IDC Certificate
Schedule of Works (Specification Page)
Track Design
Track Alignment
Gauging Assessment
General Arrangement Drawing including:
Horizontal track alignment and Vertical profile
Track cross sections
Base plate arrangements and packing schedules
Wheel Timber sizes including any tapering
Stressing diagram
The Manea delivery was planned across seven core weekend possessions, where installations were prioritised by existing timber conditions. This meant the planning and delivery were challenging based on the significant volume of works. All works went ahead without issue.
Power in Numbers
30
Staff
50
Duration
200
Other